Go Back   Team-BHP > Buckle Up > 4x4 & Off-Roading > 4x4 Vehicles


Reply
 
Thread Tools Search this Thread
Old 22nd June 2009, 13:47   #121
BHPian
 
A-jay's Avatar
 
Join Date: Feb 2009
Location: Bangalore
Posts: 42
Thanked: 3 Times
Default

Good stuff buddy. Got to see the pics. You must be a hapy man. i know how i felt.
All the best . try to catch up in blore for a ride
A-jay is offline   Reply With Quote
Old 23rd June 2009, 12:06   #122
BHPian
 
krishnathanthri's Avatar
 
Join Date: Apr 2009
Location: Mysore <---> Bangalore
Posts: 299
Thanked: 41 Times
Default

Quote:
Originally Posted by Ramsagar View Post
Your dream project is accomplished.wanna try this babe.Give me a call when it comes B'lore.
can anyone tell me the App price of the Spraco/Recaro seats in Blore.
Spraco/Recaro look alike seats cost nearly 12-15k in Bangalore. I am going to see the quality and finish of the same today. The dealer had told its 16k. Am yet to negotiate and finalize.
krishnathanthri is offline   Reply With Quote
Old 29th June 2009, 09:59   #123
BHPian
 
krishnathanthri's Avatar
 
Join Date: Apr 2009
Location: Mysore <---> Bangalore
Posts: 299
Thanked: 41 Times
Default My Gypsy after tyre and Alloy wheel's fitting.

Hi All,

On 25th my Gypsy was out of garage and my father took the delivery.

I asked my father to give it to mass the next day for
1. General check up.
2. Suspension bush replacement
3. 4x4 gear lever and shaft fitting work.

The Maruti authorized service (MAS) people promised deliver on 27th (Saturday). I reached Mysore on 26th night. Saturday morning (27th) even before the workshop was open I was there chatting with watchman and enquiring about the opening timings.

At 9:00 clock the workshop gates where opened, I directly went inside looking for my Gypsy. There she was standing, I was amazed to she her in new set of shoes and alloys. I was literally jumping when I saw her.

Now check out how she looks.

My Gypsy Rebuild Project-kiran-tanthris-gypsy_1.jpg


Note: The bonnet was not locked when I clicked the above snap. The top work is yet to be completed.

Guys do let me know how she looks.

There is still some more work pending.

1. Hella rally light’s fitting. (Wiring work is done, only fitting is left).
2. Water Proof soft top is yet to be fitted.
3. Floor mat work is also pending.

I have finalized on the material for soft top and also the floor. Tomorrow measurement and stitching work will be done and fitting will be done on 1 July.

Wait for the final Photo shoot snaps.....
krishnathanthri is offline   Reply With Quote
Old 29th June 2009, 10:05   #124
Senior - BHPian
 
Join Date: Sep 2008
Location: Bangalore
Posts: 1,891
Thanked: 19 Times
Default

Hi Krishna

You are being Overhauled !!!!
Red indeed shows your pasion for the the Gypsy.
StarVegabond is offline   Reply With Quote
Old 29th June 2009, 10:13   #125
BHPian
 
randeep04's Avatar
 
Join Date: Nov 2008
Location: Gurgaon
Posts: 629
Thanked: 15 Times
Default

Quote:
Originally Posted by krishnathanthri View Post
Hi All,

On 25th my Gypsy was out of garage and my father took the delivery.

I asked my father to give it to mass the next day for
1. General check up.
2. Suspension bush replacement
3. 4x4 gear lever and shaft fitting work.

The Maruti authorized service (MAS) people promised deliver on 27th (Saturday). I reached Mysore on 26th night. Saturday morning (27th) even before the workshop was open I was there chatting with watchman and enquiring about the opening timings.

At 9:00 clock the workshop gates where opened, I directly went inside looking for my Gypsy. There she was standing, I was amazed to she her in new set of shoes and alloys. I was literally jumping when I saw her.

Now check out how she looks.

Attachment 152803


Note: The bonnet was not locked when I clicked the above snap. The top work is yet to be completed.

Guys do let me know how she looks.

There is still some more work pending.

1. Hella rally light’s fitting. (Wiring work is done, only fitting is left).
2. Water Proof soft top is yet to be fitted.
3. Floor mat work is also pending.

I have finalized on the material for soft top and also the floor. Tomorrow measurement and stitching work will be done and fitting will be done on 1 July.

Wait for the final Photo shoot snaps.....
Hi Krishna,

The Gypsy looks stunning. The Red and Black combo give it a "dont mess with me" attitude.

Waiting for more pics from your end.

Cheers !!!!!!

Randeep
randeep04 is offline   Reply With Quote
Old 29th June 2009, 10:21   #126
BHPian
 
Amar82's Avatar
 
Join Date: May 2009
Location: Ludhiana
Posts: 290
Thanked: 4 Times
Default

Quote:
Originally Posted by krishnathanthri View Post
Guys do let me know how she looks.

There is still some more work pending.


Wait for the final Photo shoot snaps.....

Hi Krishna,
Your Gypsy indeed looks awesome, couldn't have expected more. The tyres and alloys goes perfect with the tone of the vehicle.

Waiting for final pics to arrive.

Amar
Amar82 is offline   Reply With Quote
Old 29th June 2009, 10:37   #127
BHPian
 
S@~+#0$#'s Avatar
 
Join Date: Mar 2006
Location: Bangalore
Posts: 701
Thanked: 36 Times
Default

Congrats Krishna. Your Gypsy looks killer mate!! Very very nicely done up and documented.
S@~+#0$# is offline   Reply With Quote
Old 29th June 2009, 10:52   #128
Senior - BHPian
 
Join Date: Feb 2006
Location: Bangalore
Posts: 1,240
Thanked: 225 Times
Default

Krishnatantri,

Your machine looks great. Colour combinations are amazing. Would love to see it when in Bangalore.
dwaraka is offline   Reply With Quote
Old 29th June 2009, 11:12   #129
Senior - BHPian
 
Join Date: Feb 2006
Location: BLR
Posts: 2,222
Thanked: 10 Times
Default

Missed this earlier but just went through the thread.......... Great work!!

Lot of effort and vitamin M gone into the project, showing in the end result
s0uljah is offline   Reply With Quote
Old 29th June 2009, 11:18   #130
BHPian
 
A-jay's Avatar
 
Join Date: Feb 2009
Location: Bangalore
Posts: 42
Thanked: 3 Times
Default

Way to go Buddy,

it looks awesom.

Once the lights are on it will look killer.

Where you getting the soft top done. How much does it add up to? What about the frame for the soft top did you get t done or picked it up from some where.

We should catchup some time. Need to see your ride up front.

Cheers
Aj
A-jay is offline   Reply With Quote
Old 29th June 2009, 11:24   #131
BHPian
 
agentsmith's Avatar
 
Join Date: Aug 2006
Location: Bangalore
Posts: 72
Thanked: 2 Times
Default

The gypsy's turned out to be a real stunner! Congratulations! The passion red gypsy with black top, and white lettering on the tyres look too good!
agentsmith is offline   Reply With Quote
Old 29th June 2009, 11:25   #132
Senior - BHPian
 
Kandisa's Avatar
 
Join Date: Oct 2008
Location: Noida
Posts: 1,041
Thanked: 204 Times
Default

The gypsy is looking really good in that kind of combo. How much you paid for the tyres and alloys?
-regards,
Kandisa is offline   Reply With Quote
Old 29th June 2009, 11:47   #133
BHPian
 
rmonie's Avatar
 
Join Date: Jul 2007
Location: Gurgaon
Posts: 214
Thanked: 41 Times
Default

Krishna
Congratulations!
Looking cool! Really like the Red / Black combo. Can we have some interior views also in addition to the finished pictures?
rmonie is offline   Reply With Quote
Old 29th June 2009, 12:24   #134
BHPian
 
siddartha's Avatar
 
Join Date: Aug 2008
Location: bangalore
Posts: 671
Thanked: 21 Times
Default

Its looking really nice, the black on the windscreen frame and the center pillar is a lovely touch. check the yellow box in the pic, something seems out of line.
Attached Thumbnails
My Gypsy Rebuild Project-kiran20tanthri27s20gypsy_1.jpg  

siddartha is offline   Reply With Quote
Old 29th June 2009, 12:31   #135
BHPian
 
krishnathanthri's Avatar
 
Join Date: Apr 2009
Location: Mysore <---> Bangalore
Posts: 299
Thanked: 41 Times
Default

Quote:
Originally Posted by siddartha View Post
Its looking really nice, the black on the windscreen frame and the center pillar is a lovely touch. check the yellow box in the pic, something seems out of line.

Note: The bonnet was not locked when I clicked the above snap. The top work is yet to be completed.
krishnathanthri is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search


Similar Threads
Thread Thread Starter Forum Replies Last Post
2lac+ kilometers m800 engine rebuild project. SirAlec Modifications & Accessories 75 24th June 2013 17:36
My Gypsy rebuild - Stage 2 Anil Vincent 4x4 Vehicles 122 21st April 2011 11:43
My Gypsy Rebuild - Bushranger Ashish B 4x4 Vehicles 69 20th October 2010 08:31


All times are GMT +5.5. The time now is 01:39.

Copyright ©2000 - 2017, Team-BHP.com
Proudly powered by E2E Networks