View Single Post
Old 6th January 2008, 21:19   #13 (permalink)
navpreet318
BHPian
 
navpreet318's Avatar
 
Join Date: Jul 2005
Location: Dehradun
Posts: 347
Default

thank you.

well 4 days are required because the compound that i used was araldite mixed with saw dust.it takes a long time to set.in a thin layer it takes atleast 24 hours.where as i had used it as a filler material.
and when it sets it emits very pungent smells.and these fumes also ruin the rubber surrounds of the sub.so i had to wait for 4 days.

i wasn't free those 4 days.was doing wiring and damping.

Last edited by navpreet318 : 6th January 2008 at 21:21.
navpreet318 is offline   Reply With Quote