thank you.
well 4 days are required because the compound that i used was araldite mixed with saw dust.it takes a long time to set.in a thin layer it takes atleast 24 hours.where as i had used it as a filler material.
and when it sets it emits very pungent smells.and these fumes also ruin the rubber surrounds of the sub.so i had to wait for 4 days.
i wasn't free those 4 days.was doing wiring and damping.
Last edited by navpreet318 : 6th January 2008 at 21:21.
|