Yes, so we from Kanpur have to cross the Ganges twice to get back to our bank of the Ganges. - Kanpur to trans-Ganga (normally Barrage so no bridge), and then back on the 8-lane bridge on the E-way. Also, I hear sales of real estate in the Trans Ganga city is in a bad shape. Sky-high prices, total uncertainty about infrastructure (UPians do not trust the sarkar), and apparently total ban on reselling (so no exit).

Points on ALE where one can enter/exit


Start point agra inner ring road

pkg1
1 fatehabad-firozabad road

pkg2
2 NH2
3 SH83 (near karhal)
4 NH92

pkg3
Nil

pkg4
5 SH 21 (link to Kannauj)
6 GT Road
7 SH38 (Just after Ganga)

pkg5
8 Lucknow ring road

end point Mohan road
skdking is offline   Reply With Quote
Old 22nd April 2016, 13:20   #77
BHPian
 
Join Date: Nov 2009
Location: chennai
Posts: 472
Thanked: 124 Times
Default re: Agra Lucknow Expressway on the fast track EDIT: Formally inaugurated!

Quote:
Originally Posted by sgiitk View Post
Yes, so we from Kanpur have to cross the Ganges twice to get back to our bank of the Ganges. - Kanpur to trans-Ganga (normally Barrage so no bridge), and then back on the 8-lane bridge on the E-way. Also, I hear sales of real estate in the Trans Ganga city is in a bad shape. Sky-high prices, total uncertainty about infrastructure (UPians do not trust the sarkar), and apparently total ban on reselling (so no exit).
Dear Prof,

Else you can drive to Araul (Near Kannauj) and get on to ALE. 65 km it is.

Should suit you.

Last edited by skdking : 22nd April 2016 at 13:23.
skdking is offline   Reply With Quote
Old 23rd April 2016, 15:23   #78
Distinguished - BHPian
 
sgiitk's Avatar
 
Join Date: Dec 2007
Location: Kanpur
Posts: 7,044
Thanked: 3,590 Times
Default re: Agra Lucknow Expressway on the fast track EDIT: Formally inaugurated!

Quote:
Originally Posted by skdking View Post
Dear Prof,

Else you can drive to Araul (Near Kannauj) and get on to ALE. 65 km it is.
Given the current state of NH91 no way! I do not want to do even 10km on it.
sgiitk is offline   Reply With Quote
Old 23rd April 2016, 21:52   #79
BHPian
 
Join Date: Nov 2009
Location: chennai
Posts: 472
Thanked: 124 Times
Default re: Agra Lucknow Expressway on the fast track EDIT: Formally inaugurated!

Quote:
Originally Posted by sgiitk View Post
Given the current state of NH91 no way! I do not want to do even 10km on it.
Dear Prof,

Hohoho. For avoiding NH 91 you may have to go to Bangarmau (82 km) or Kathaphori on NH 2 (182 Km) as these are the nearest entry points to ALE.

I visited Kannauj in Feb. Between Kannauj and Chhibramau NH 91 was not so bad. Had been recently repaired in patches. No idea about the rest of it.
skdking is offline   Reply With Quote
Old 24th April 2016, 06:51   #80
Distinguished - BHPian
 
sgiitk's Avatar
 
Join Date: Dec 2007
Location: Kanpur
Posts: 7,044
Thanked: 3,590 Times
Default re: Agra Lucknow Expressway on the fast track EDIT: Formally inaugurated!

Let the ALE (Agra Lucknow Expressway) come and then I will see. As it stands the barrage is not that far from my house (<10km) so it is not a real pain. I am sure something will be worked out from the Kanpur traffic.
sgiitk is offline   Reply With Quote
Old 3rd June 2016, 09:51   #81
Distinguished - BHPian
 
sgiitk's Avatar
 
Join Date: Dec 2007
Location: Kanpur
Posts: 7,044
Thanked: 3,590 Times
Default re: Agra Lucknow Expressway on the fast track EDIT: Formally inaugurated!

As per today's paper the section linking two 'Royal' constituencies, Etawah-Kannauj is to be opened in October (I guess 2016!). Fingers crossed, even though it done me no good.
sgiitk is offline   Reply With Quote
Old 29th August 2016, 23:30   #82
BHPian
 
Join Date: Oct 2012
Location: Hyderabad
Posts: 359
Thanked: 126 Times
Default re: Agra Lucknow Expressway on the fast track EDIT: Formally inaugurated!

Apparently .. we are on dot for the expressway inauguration in October - so much in the name of coming polls.

ET - Lucknow Agra Expressway

Not quite sure of the claim to be built in record time
deepv is offline   Reply With Quote
Old 30th August 2016, 04:29   #83
BHPian
 
Shivanshu's Avatar
 
Join Date: Jun 2015
Location: Ghaziabad
Posts: 196
Thanked: 250 Times
Default re: Agra Lucknow Expressway on the fast track EDIT: Formally inaugurated!

So if we drive from Indirapuram to Lucknow. We have to take the Yamuna Expressway and then from there it will connect to ALE? What will be the point of connection to the ALE from Yamuna Expressway side?
Shivanshu is online now   Reply With Quote
Old 30th August 2016, 10:03   #84
BHPian
 
Join Date: Mar 2016
Location: Gurgaon
Posts: 215
Thanked: 424 Times
Default re: Agra Lucknow Expressway on the fast track EDIT: Formally inaugurated!

Quote:
Originally Posted by Shivanshu View Post
So if we drive from Indirapuram to Lucknow. We have to take the Yamuna Expressway and then from there it will connect to ALE? What will be the point of connection to the ALE from Yamuna Expressway side?
Yamuna Expressway is directly being linked to ALE. Seems like a 5-6 km link between them.

Agra Lucknow Expressway on the fast track EDIT: Formally inaugurated!-screen-shot-20160830-9.58.58-am.png
autorahul is offline   (1) Thanks Reply With Quote
Old 30th August 2016, 10:11   #85
BHPian
 
Join Date: Nov 2009
Location: chennai
Posts: 472
Thanked: 124 Times
Default re: Agra Lucknow Expressway on the fast track EDIT: Formally inaugurated!

Quote:
Originally Posted by Shivanshu View Post
So if we drive from Indirapuram to Lucknow. We have to take the Yamuna Expressway and then from there it will connect to ALE? What will be the point of connection to the ALE from Yamuna Expressway side?
Hello there,

One will have to continue from YEW to Agra Ring Road.

After about 10 km there will be an interchange to get onto ALE, as shown in the picture below: -
Attached Thumbnails
Agra Lucknow Expressway on the fast track EDIT: Formally inaugurated!-ale-yew.png  

skdking is offline   (1) Thanks Reply With Quote
Old 30th August 2016, 12:24   #86
Distinguished - BHPian
 
sgiitk's Avatar
 
Join Date: Dec 2007
Location: Kanpur
Posts: 7,044
Thanked: 3,590 Times
Default re: Agra Lucknow Expressway on the fast track EDIT: Formally inaugurated!

October inauguration may be more political than real. Some sections will be inaugurated, and not all of them. Also, the idea of developing veg and fruit mandis, and other sundry bits along the E-way makes me worried. Some babus trying to curry favours may render it more of as a Bullock Cart track.Imagine a herd of tractors with trollies on the LEA. Take NH2/AH1 outside Kanpur the fruit and veg wholesale market at Chakarpur was a nightmare until in the six laning process it was taken care of, by a large flyover.
sgiitk is offline   Reply With Quote
Old 30th August 2016, 13:06   #87
BHPian
 
Join Date: Oct 2012
Location: Hyderabad
Posts: 359
Thanked: 126 Times
Default re: Agra Lucknow Expressway on the fast track EDIT: Formally inaugurated!

Quote:
Originally Posted by sgiitk View Post
... Some babus trying to curry favours may render it more of as a Bullock Cart track....
Yeah, if not bullock carts I would surely expect tractors coming along, especially so from wrong direction.
Due to long divided lanes we used to see loads of such localites on Hyd-Vijaywada highway after its six laning, causing many a accidents.
deepv is offline   (1) Thanks Reply With Quote
Old 14th November 2016, 17:10   #88
BHPian
 
Join Date: Nov 2009
Location: chennai
Posts: 472
Thanked: 124 Times
Default re: Agra Lucknow Expressway on the fast track EDIT: Formally inaugurated!

ALE is getting ready for inauguration. Please read these two news reports.

http://www.financialexpress.com/indi...rom-it/445238/

http://timesofindia.indiatimes.com/c...w/55402700.cms
skdking is offline   (1) Thanks Reply With Quote
Old 21st November 2016, 11:49   #89
BHPian
 
bbhavan's Avatar
 
Join Date: Sep 2012
Location: Cochin
Posts: 171
Thanked: 77 Times
Default re: Agra Lucknow Expressway on the fast track EDIT: Formally inaugurated!

This is going to be inaugurated today. As per the news reports, 8 fighter jets are going to be landed on this 6 lane highway as part of the inauguration.
It is going to be near Unnao, as I saw in the article.

Can anybody confirm, about the completeness of this project in all aspects?
bbhavan is offline   Reply With Quote
Old 21st November 2016, 12:19   #90
BHPian
 
Join Date: Sep 2007
Location: Pune
Posts: 285
Thanked: 185 Times
Default re: Agra Lucknow Expressway on the fast track EDIT: Formally inaugurated!

Quote:
Originally Posted by bbhavan View Post
This is going to be inaugurated today. As per the news reports, 8 fighter jets are going to be landed on this 6 lane highway as part of the inauguration.
It is going to be near Unnao, as I saw in the article.

Can anybody confirm, about the completeness of this project in all aspects?
This is confirmed. It is on the NDTV website now. 4 Sukhois and 4 Mirage 2000s. The reports says that the jets will skim the expressway in a simulated landing.
ptushar is online now   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search


Similar Threads
Thread Thread Starter Forum Replies Last Post
Muzaffarpur to Delhi via Gorakhpur-Faizabad-Lucknow-Kanpur-Agra-Palwal (NH2 & 71B) BoneCollector Route / Travel Queries 29 7th July 2017 22:34
Lucknow, Binsar and Agra in an Esteem - 6,500 km trip BlackPearl Travelogues 9 26th February 2016 19:30
A trip to Lucknow - Janab muskuraie, kyunki aap Lucknow mein hain predatorwheelz Travelogues 31 30th October 2015 12:37
A road trip that changed my driving horizons! 3860 kms Lucknow-Mumbai-Lucknow LongDrive lover Travelogues 119 16th July 2013 23:29
Formally into Team-BHP gans Introduce yourself 6 14th November 2009 01:05


All times are GMT +5.5. The time now is 21:08.

Copyright 2000 - 2017, Team-BHP.com
Proudly powered by E2E Networks