| |||||||
| Register | BHP Garage | Classifieds | Team-BHP FAQ | Members List | Calendar | Search | Today's Posts | Mark Forums Read |
| Route / Travel Queries About the best routes or other travel related questions. |
![]() |
| | Thread Tools |
| | #1 (permalink) |
| BHPian Join Date: Aug 2006 Location: Bangalore
Posts: 467
| I have traveled on the NICE road connecting Bannerghatta road and Mysore road over Kanakapura road. I would like to know whether this road extends and connect to Tumkur road also. Anybody who has used this road, if they can give details, will be of great help. PS: NICE website - NANDI INFRASTRUCTURE CORRIDOR ENTERPRISES LIMITED PS: Sketch of outer peripheral road connecting Hosur road to Tumkur road - Phase -A Components |
| | |
| | #2 (permalink) |
| Distinguished - BHPian ![]() | The stretch from Mysore road to tumkur road is still under construction. You can see a flyover being built just before the toll plaza. Also the stretch connecting bannerghatta road is still to be ready due to some land disputes.
__________________ \ / ][ |) `/ [_] "!" (\./) (o.o) ( X ) This is Bunny. Copy Bunny into your signature to help him achieve world domination. |
| | |
| | #5 (permalink) | |
| Team-BHP Moderator ![]() | Quote:
Granny's tale Its completely done up. Only the last-mile connectivity to either road is not done and is currently serviced by a goat track. msdivy, The Mysore Rd-Tunkur Rd stretch has been completed and was thrown open unofficially for public use until a week back. Its the best stretch of the entire NICE corridor since its also the newest - I've been on it myself. A superbiker friend of mine and his group also had their pictorial in the Times of India taken on this stretch. But from 6 days back they've blocked entry to the road from both ends by dumping a huge pile of mud at either ends.
__________________ If you lose your temper, you’ve lost the argument | |
| | |
| | #6 (permalink) |
| Senior - BHPian | Mahesh I was just gonna PM you and ask you to reply here. Last I heard was from my friend who said the road was un-officially open for traffic. Did you get to drive the complete stretch?
__________________ Cheers rjstyles You never really learn to SWEAR until you learn to DRIVE. |
| | |
| | #8 (permalink) |
| Senior - BHPian | I travelled from Mysore road to electronic city in NICE road couple of times, it saved me 60% of the time compared with If I had taken banashankari BTM ring road and hosur road to reach electronic city from vijaynagar. From Nagarbhavi to electronic city its 36km in 50 minutes drive via NICE expressway.Regards, Ravi. |
| | |
| | #9 (permalink) |
| BHPian | The NICE corridor is a nice road for speeding... hardly any vehicles and wide well made roads. I touched 180 kph on that road once. However the connection to bannerghatta road is horrid to say the least... there's no road and its cross country suitable for SUVs .Last edited by reignofchaos : 28th July 2007 at 05:29. |
| | |
| | #10 (permalink) |
| BHPian Join Date: Aug 2006 Location: Bangalore
Posts: 78
| Guys, Did you see the news yesterday. Kheni is ready to close this road if Govt ask him to do it !!! With govt not giving land for further construction of road & no toll being collected still, Kheni could close this road anytime What sad state of affairs, politicians are not allowing infrastructure development for their personal ego & interests. |
| | |
| | #12 (permalink) |
| Team-BHP Moderator ![]() | Not much has changed in terms of usability. 1. The last stretch of this network - Mysore Rd- Tumkur Rd stretch has been permanently opened. 2. The last-mile connectivity from any NICE corridor to the main roads (except Bannerghatta Rd connectivity) is asphalted very nicely and no longer a goat track 3. WIP on constructing the bridges to directly connect these NICE stretches overflying the main roads 4. Access ramps from Mysore Road towards the Mysore Rd - Tumkur Rd section is also a WIP. The only currently unresolved status remains with the Bannerghatta Road terminations/connectivity.
__________________ If you lose your temper, you’ve lost the argument |
| | |
| | #13 (permalink) |
| BHPian | Wonder how many will want to use this road for regular commute to work, considering that on completion of the last mile connectivity on either side of Bannerghatta road, NICE Ltd will start collecting toll. Any ideas how much it will be? Cheers, Rajan
__________________ Your dog's admiration for you is not conclusive proof of your superiority _________________________ FIAT PALIO 1.1 SLX Dec 2007 |
| | |
| | #15 (permalink) |
| Senior - BHPian | I also use these roads right from Mysroe road till Hosur road twice a week. BTW, Kheni has erected the Congress and BJP banners near his office. No JD(S). Way to go Kheni, if congress/bjp comes to poewr, then we can assume that this will be definately completed. Looks like or Governer is also supporting this project. He has already removed an IAS officer who was incharge of this project and replaced with new. Also the approach on Nice road near kanakapura road is asphalted. And the nice road connecting to mysore road is also asplhalted. Work is definately going on may not be at full steam.
__________________ Love your job but Never love your company because you never know when your company stops loving you-NRN |
| | |
![]() |
| Thread Tools | |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Bangalore – Coimbatore - Bangalore. The road less traveled. | romits | Travelogues | 19 | 3rd January 2008 09:39 |
| Bangalore-Kolkata (Bolpur)- Bangalore Road trip | biswajit | Route / Travel Queries | 6 | 27th October 2007 16:03 |
| Any of you read Winding Road and e-automag [Its Nice!] | 1Day | Shifting gears | 9 | 6th February 2007 16:50 |
| Bangalore - Chennai - Bangalore Road Trip | haikvr | Route / Travel Queries | 3 | 16th August 2006 16:20 |
| Nice guys finish last ?? Details of an encounter on the road. | s0uljah | Street Experiences | 17 | 22nd April 2006 10:34 |
All times are GMT +5.5. The time now is 17:29.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407









Its completely done up. Only the last-mile connectivity to either road is not done and is currently serviced by a goat track.
via NICE expressway.
.
