The long overdue asphalting work has been taken up on the Inner Ring Road here at Bangalore.

The stretch from Ejipura signal to Domlur flyover has been prepared for asphalting, and the asphalting work has already been completed for about 25% of the stretch.

Hope the fast pace of work is maintained, and we get a brand new road by the weekend
mooza is offline   Reply With Quote
Old 24th March 2010, 21:35   #2
BHPian
 
Join Date: Sep 2008
Location: Bangalore
Posts: 345
Thanked: 3 Times
Default

Great news! Hope the new coat will survive this monsoon.
funda2max is offline   Reply With Quote
Old 24th March 2010, 22:05   #3
Senior - BHPian
 
black12rr's Avatar
 
Join Date: Dec 2005
Location: Ridin earth now
Posts: 1,258
Thanked: 271 Times
Default

Can some one tell me what was wrong with the earlier road .I travel on this road every day for past 5- 6 years . It was just perfect .

There was no need to reorder the dividers or the Krebs on the either side . The side reflectors are now under the tar ,what a waste of money again .Again they will install new ones and again a coat of reflector paint .

Some one got really rich just to relay the tar , what a waste of money .

Last edited by black12rr : 24th March 2010 at 22:06.
black12rr is offline   Reply With Quote
Old 24th March 2010, 22:27   #4
jav
BHPian
 
Join Date: Apr 2007
Location: Bangalore
Posts: 194
Thanked: 5 Times
Default

The road looks wider now and no tire noise from my tires on the new tar as well

Last edited by jav : 24th March 2010 at 22:29.
jav is offline   Reply With Quote
Old 24th March 2010, 22:43   #5
BHPian
 
arin_12's Avatar
 
Join Date: Jul 2008
Location: Bangalore
Posts: 596
Thanked: 18 Times
Default

If you look properly they have widen the road slightly. The tar was really required at the starting of the ring road (Domlur side). It was a horrible. Lets wait till the mansoon, that time will only show the exact capality of the new construction. Hope the water will not clog near the Pizza Hut and also side of the road.
Innerrinng road also need some tree on both the side. Almost no shade at all.
arin_12 is offline   Reply With Quote
Old 24th March 2010, 22:46   #6
BHPian
 
techfreak's Avatar
 
Join Date: Aug 2009
Location: Leh
Posts: 285
Thanked: 156 Times
Default

Yes indeed it was long due n required.
But as we know our quality of constr it only after monsoon we know how good or bad it has been!!
techfreak is offline   Reply With Quote
Old 25th March 2010, 07:19   #7
Senior - BHPian
 
mooza's Avatar
 
Join Date: Oct 2009
Location: Bangalore
Posts: 1,039
Thanked: 229 Times
Default

The worst portion of this stretch is near Giria's showroom (near the speed breakers). I hope that gets covered today. This area gets waterlogged during the monsoons because of very poor drainage, inspite of the biggest drain duct passing through Domlur nearby (what an irony!), that's the reason why the road here is susceptible to damage.

As rightly observed by Arin and Jav, the road is getting widened, and therefore receiving the coat of tar as a part of this exercise, I guess.

The kerbs are also being prepared, to help pedestrians, who had no choice earlier other than walking on the road. Hope the good work continues!

Last edited by mooza : 25th March 2010 at 07:22.
mooza is offline   Reply With Quote
Old 6th May 2010, 15:49   #8
BHPian
 
BuRnT RuBbEr's Avatar
 
Join Date: May 2005
Location: DL 1
Posts: 367
Thanked: 11 Times
Default

They have left it incomplete near the ejipura side.
BuRnT RuBbEr is offline   Reply With Quote
Old 10th May 2010, 16:01   #9
Team-BHP Support
 
ampere's Avatar
 
Join Date: Sep 2009
Location: Bangalore
Posts: 15,349
Thanked: 8,165 Times
Default

please note max speed is still 50. Dont overspeed. Big brother watches nowadays.
ampere is offline   Reply With Quote
Old 10th May 2010, 16:15   #10
BHPian
 
pradipk's Avatar
 
Join Date: Aug 2008
Location: Bangalore
Posts: 213
Thanked: 19 Times
Default

Yes, it's widen now. The divider is shredded a bit, proper foot path is made on both the sides and as a result new coat is done. It's better that they applied coat all over the road rather putting patch near the divider. Also, humps near Dell are much better now.
pradipk is online now   Reply With Quote
Old 11th May 2010, 19:08   #11
Senior - BHPian
 
mooza's Avatar
 
Join Date: Oct 2009
Location: Bangalore
Posts: 1,039
Thanked: 229 Times
Default

Yes, the road work seems complete, but the interlocking cement blocks for the kerb are still under progress at some places.

Strange, but the road seems a bit bumpier after the coat of tar, at some places. Wonder what sort of quality checks are carried out to certify the work.
mooza is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search


Similar Threads
Thread Thread Starter Forum Replies Last Post
Finally finally finally finally... s4ch Introduce yourself 3 29th March 2012 19:44
Be very conscious while driving in Inner ring road (IRR) vinayvtec Street Experiences 87 9th August 2010 07:31
Horrific accident in Inner ring road today kvish Street Experiences 43 25th March 2010 00:45
Kinekt Gear Ring : Finger ring for the gearhead! josepeter Shifting gears 0 14th February 2010 10:50


All times are GMT +5.5. The time now is 13:50.

Copyright 2000 - 2017, Team-BHP.com
Proudly powered by E2E Networks