Ather Energy plans to set up third manufacturing plant

Bangalore-based Ather Energy is looking to set up its third manufacturing plant in India and is said to be in talks with several state governments, including Andhra Pradesh, Maharashtra, Gujarat, Telangana and Karnataka.

Ather Energy plans to set up third manufacturing plant-ather450x1068x651.jpg

According to media reports, Ather Energy plans to add an annual capacity of about 15 lakh units. At present, the plant at Hosur, Tamil Nadu has a capacity of 1.2 lakh units per annum, which is expected to increase to around 4 lakh units when the second assembly line becomes operational later this year.

Ather Energy is looking to acquire around 100 acres of land parcel to build its third manufacturing facility. Reports suggest that the company is in the last phase of negotiations and is likely to finalize the location within the next month.

Source: ET Auto
TusharK is offline   (4) Thanks
Old 17th June 2022, 13:52   #2
Senior - BHPian
 
SKC-auto's Avatar
 
Join Date: Jan 2020
Location: KA01/AP31
Posts: 1,194
Thanked: 3,425 Times
Re: Ather Energy plans to set up third manufacturing plant

Why? you already have an annual capacity of 4 lakh per year, you are selling 25K per year, why do you want 15lakh capacity. Is there a very desirable product launch happening in the next 1 year?
SKC-auto is offline   (5) Thanks
Old 17th June 2022, 21:22   #3
BHPian
 
Join Date: Sep 2011
Location: Chennai
Posts: 239
Thanked: 176 Times
Re: Ather Energy plans to set up third manufacturing plant

Welcome move. The current wait times are 2-3 months. Hope this brings down the wait time.
knaveen is offline  
Old 17th June 2022, 22:26   #4
BHPian
 
Join Date: Feb 2021
Location: TN66/TN14
Posts: 858
Thanked: 2,149 Times
Re: Ather Energy plans to set up third manufacturing plant

Quote:
Originally Posted by knaveen View Post
Welcome move. The current wait times are 2-3 months. Hope this brings down the wait time.
The wait time is no way related to the production capacity. Especially when the existing capacity itself if not utilised to the full number.
The wait time is due to other reasons. Like supply chain issues, chip shortage, etc.
Livnletcarsliv is offline  
Old 17th June 2022, 23:47   #5
BHPian
 
Join Date: Aug 2010
Location: Bangalore
Posts: 509
Thanked: 1,448 Times
Re: Ather Energy plans to set up third manufacturing plant

Quote:
Originally Posted by TusharK View Post
At present, the plant at Hosur, Tamil Nadu has a capacity of 1.2 lakh units per annum, which is expected to increase to around 4 lakh units when the second assembly line becomes operational later this year.
Quote:
Originally Posted by SKC-auto View Post
Why? you already have an annual capacity of 4 lakh per year, you are selling 25K per year, why do you want 15lakh capacity. Is there a very desirable product launch happening in the next 1 year?

Are these news bytes to attract more PE money at more valuation?

Or their IPO could be coming where the PEs will exit at high valuations after pushing these type of news.
fordday is offline   (2) Thanks
Old 20th June 2022, 03:47   #6
Senior - BHPian
 
SoumenD's Avatar
 
Join Date: Feb 2013
Location: India
Posts: 1,756
Thanked: 6,318 Times
Re: Ather Energy plans to set up third manufacturing plant

Looks more like a statement to attract investors than anything else. Their current plant’s capacity is 1.2L units and they are selling less than half of it annually. What will they do with more capacity?