Re: Alternative energy business - Wind, Solar, Biogas Etc

Quote:
Originally Posted by shri View Post
I got the following quotation from a vendor for an on-grid solar PV system

CUSTOMER ENERGY STATISTICS AND REQUIREMENT:
a. Meter Sl.No. : NA
b. Meter Type: Three Phase
c. Sanctioned Load: NA
d. Energy Consumption
a. Average Monthly Unit(KWh) Consumption: 400
b. Average Daily Unit(KWh) Consumption: 13.33
e. Solar System generation: 1KW Solar system will generate 4 Units/Day on average
a. For 100% Solar generation Solar Plant capacity required – 5KWp
f. Customer Requirement: Solar Plant Max Capacity – 6.75KWp (Because of Three phase
configuration)
a. Solar Panel capacity – 5KW
b. Solar On-Grid Inverter - 3Ø 6KW Grid-Tied Inverter
c. Average Daily Solar generation in Unit(KWh): 20-25 Units
d. Average Monthly Solar generation in Unit(KWh): 600 - 750
g. The above proposed Solar System will reduce the Grid Electricity by – 100% and export excess to
MESCOM grid

QUOTATION - ON-GRID SOLAR SYSTEM 6KW
Sl.No. Description Quantity(No’s) Rate(Rs.)
1 5KW PV Modules 250Wp X 20Nos 4,95,000
2 6KVA Grid Tied Inverter 1
3 DC Combiner Box 1
4 DC Distribution Box 1
5 AC Combiner Box 1
6 AC Distribution Box 1
7 Energy Meters 2
8 Earthing Rod, Earth Enhancing chemical 4
9 Wires, Pipes, Connectors – Other accessories As required
10 Module mounting structure 1
11 Transport, Labour Charges, Installation As required
Total 4,95,000
Tax amount(14.5% VAT on 20% Amount of bill) 14,355
Grand Total 5,09,355
What is area(sft) required for the installation of this capacity solar panels? And how many solar panels will be installed.
amit_snk is offline  
Old 4th June 2016, 12:40   #17
Newbie
 
shri's Avatar
 
Join Date: Oct 2005
Location: India
Posts: 18
Thanked: 13 Times
Re: Alternative energy business - Wind, Solar, Biogas Etc

Quote:
Originally Posted by inder View Post
I have also filled the express interest form on the MNRE website and also Mahadiscom for the rooftop solar scheme of the Govt. Yet to receive a quote. Is the grand total 5.09 lacs without subsidy ?
Without subsidy. The per-unit rate is higher if subsidy is not opted for. Also the vendor dates almost no one applies for subsidy as the bureaucracy/red tape is too much of aheadache.

Quote:
Originally Posted by amit_snk
What is area(sft) required for the installation of this capacity solar panels? And how many solar panels will be installed.
SOLAR PANELS (PV MODULE):
1. Size: 1660mm X 993mm X 35mm
2. Make: Jaisun Solar (Tamilnadu Energy Solutionss Pvt. Ltd.)
3. Type: Poly Crystalline
4. No. of Module: 20 Nos
5. Total Area Required: 400 sq.ft
6. No. of Solar Cells/ Module: 60
shri is offline  
Old 22nd January 2020, 20:08   #18
Distinguished - BHPian
 
condor's Avatar
 
Join Date: Jun 2006
Location: Speed-brkr City
Posts: 15,864
Thanked: 16,014 Times
Re: Alternative energy business - Wind, Solar, Biogas Etc

So France tried a Solar road, but ended up in the dark there.

https://bigthink.com/technology-inno...1#rebelltitem1