Continued..
1100 hrs Kothur (BP, Ghar Dhaba) 273 Kms
After having late Breakfast/Brunch (Some idlies and puri, no much choices as there was no power and the lunch would take another 1 hr) we start form there.
1110 hrs Gooty 275 Kms
We reach gooty within 10 minutes.
After Gooty the road is single but good.
We could get to see trains running parallel to the road.
1205 hrs Dhone 322 Kms
We cross Dhone.
The road is good but still single. But the widening work is going on in this part.
1220 hrs Veldurti 342 Kms
1310 hrs Kurnool 371 Kms
As we reach Kurnool the road becomes bad due to the flyover construction and the road work.
The sun is very hot and the AC is running full speed. As soon as we cross the town area the road gets better.
After 10 Kms the road is 4 lane(2+2), but we had to take deviations to the wrong side as some of the culverts/bridges are not complete.
1345 hrs Vemula (2nd Puncture) 407 Kms
We are hardly 30 Kms from Kurnool and notice the car is not smooth and is pulling sideways.
We stop to check what is wrong?
And what do we have here?? The rear left tyre is losing air
. Oh man we have another Puncture.
Though the tyre was not fully deflated, it was losing air slowly.
So took the car to the other side as the road was not open to traffic and started to replace the tyre.
The temperature was very high and was not able to touch the tyre for some time.
1355 hrs Vemula (2nd Puncture) 407 Kms
We started from there after 15 mins, In search of the next puncture shop.
As usual, found one within 3 kms but was closed. Another 5 kms we got one which was open.
1400 hrs Vemula 412 Kms
The guy removed the tyre and checked for the puncture on the tube.
To our surprise the puncture sticker from the previous puncture had come off because of the excess heat
.
He checked for any nails or sharp objects in the tyre for any further puncture possibilities but found none.
He suggested us to fix the puncture using heating method as stickers may come off like this because of excess heat.
We ask him to go ahead with that, so another 15 min for the fixing.
So start of from there after 20 min ie @ 1420.
1435 hrs Pebbair 424 Kms
We cross Pebbair bridge and stop to take some pics of the fort on the right side of the bridge.(I don’t know whether it’s a fort or something else.)
The other side of the bridge
2 Kms after the Bridge The road become good.
From here the road is fully done.
2 B Continued..