Quote:
Originally Posted by binand View Post
So I looked up some data to back up what I was saying rather than both of us talking about what we feel. Here is what I found:
Thank you. I wasn't challenging your finding at all. I think there are other factors that lead me to think this way, but ah well, I'll still pay that much for a smooth and fast ride if I want to go by road, and I guess that atleast 25% of the toll money would be savings in fuel from what we would spend right now. My thoughts are more political - that there ought to be a main arterial highway in the state connecting the major population centres and a tollway would be a 'freeway' that allows for higher speeds between them with limited stops (akin to Bangalore-Mysore); and that if high tolls are going to be collected, the state should really ramp up public transport - make it convenient and comfortable, and smoothly interconnected with intra-city transport. But, these are just my thoughts, others will think differently.



Note from Support: Please quote relevant sections of posts only. Don't quote large posts entirely. Thanks.

Last edited by aah78 : 28th February 2025 at 19:20. Reason: See note.
ZittingCisticol is offline  
Old 31st March 2025, 19:54   #62
anb
BHPian
 
anb's Avatar
 
Join Date: Nov 2005
Location: Idukki
Posts: 899
Thanked: 3,486 Times
Re: NH 66 in Kerala | Status and Updates on 6-Lane Conversion

The stretches opened for public are shown in red colour. I managed to do Kannur- Paliyekkara in 3 hours 45 minutes during day time thanks to partially opened NH66 6 lane highway. I started at 08:07 am and reached at 11:52 am.
Attached Thumbnails
NH 66 in Kerala | Status and Updates on 6-Lane Conversion-img_2943.jpeg  

NH 66 in Kerala | Status and Updates on 6-Lane Conversion-img_2944.jpeg  

anb is online now   (12) Thanks
Old 22nd April 2025, 17:32   #63
BHPian
 
Join Date: Mar 2011
Location: Lion City
Posts: 266
Thanked: 188 Times
Re: NH 66 in Kerala | Status and Updates on 6-Lane Conversion

Slightly off topic, can someone share why the NHAI bridges have approach roads which are not open for pedestrian vehicle traffic underneath, only the central portion of the bridge is where the pedestrians and vehicles can cross?
I think the part I am referring to is called abutment o something, seeing the amount of block at Kottiyam in Kollam, I was wondering about this.
aspire is offline  
Old 25th April 2025, 10:54   #64
Senior - BHPian
 
sarathlal's Avatar
 
Join Date: Apr 2012
Location: Trivandrum
Posts: 1,849
Thanked: 6,310 Times
Re: NH 66 in Kerala | Status and Updates on 6-Lane Conversion

Those who are driving through this road (Completed sections of the new NH66), please be careful and watch out for surprises. I will name a few that were deadly given the high speeds thats possible and superb road surfaces.
  • On right (fast lane), there are cases where the divider concrete slabs are tilted and kept to block half the lane. Mostly noticed where there are exits and entrances to service lane. (Saw couple of badly damaged cars near to it )
  • Vehicles coming in opposite directions, very casually. This too on the right most lane
  • Without lane marking, some sections are difficult to comprehend the turns at high speeds
  • People do walk on the right most lane. There are chances they might cross over
  • Very poorly lit sections, which is expected given the stage of development. But night riding will be risky.

In summary, do enjoy the drive, but please be over cautious for these cases.

It was a bliss driving through the completed sections and so happy to see the beautiful clean high speed highway covered with greenery on both sides

NH 66 in Kerala | Status and Updates on 6-Lane Conversion-green-nh66.jpg

Last edited by sarathlal : 25th April 2025 at 11:02.
sarathlal is offline   (22) Thanks
Old 26th April 2025, 07:49   #65
Distinguished - BHPian
 
naveen.raju's Avatar
 
Join Date: Apr 2010
Location: Cochin
Posts: 4,912
Thanked: 9,540 Times
Re: NH 66 in Kerala | Status and Updates on 6-Lane Conversion

Quote:
Originally Posted by sarathlal View Post
Very poorly lit sections, which is expected given the stage of development. But night riding will be risky.

In summary, do enjoy the drive, but please be over cautious for these cases.

It was a bliss driving through the completed sections and so happy to see the beautiful clean high speed highway covered with greenery on both sides
Saw that the plastic cones placed near the entry/exit points have already been destroyed. Thanks to some idiots trying to enter the highway.



Once completed, hopefully the entire stretch will be like this. Patiently waiting for it's completion. But things are pretty slow down south (in and around Cochin).

NH 66 in Kerala | Status and Updates on 6-Lane Conversion-screenshot-20250426-7.42.518239am.png
naveen.raju is offline   (11) Thanks
Old 27th April 2025, 11:34   #66
BHPian
 
Join Date: Feb 2021
Location: TN66/TN14
Posts: 948
Thanked: 2,319 Times
Re: NH 66 in Kerala | Status and Updates on 6-Lane Conversion

Quote:
Originally Posted by anb View Post
The stretches opened for public are shown in red colour. I managed to do Kannur- Paliyekkara in 3 hours 45 minutes during day time thanks to partially opened NH66 6 lane highway. I started at 08:07 am and reached at 11:52 am.
However, Google Maps shows 5 hours 37 minutes for 222 km (Kannur-Paliyekkara) as the shortest route. Is the Gmaps not considering the partially opened highways to calculate the route?
Livnletcarsliv is offline  
Old 27th April 2025, 12:04   #67
Senior - BHPian
 
Join Date: Dec 2008
Location: Bangalore
Posts: 3,833
Thanked: 6,127 Times
Re: NH 66 in Kerala | Status and Updates on 6-Lane Conversion

Quote:
Originally Posted by Livnletcarsliv View Post
However, Google Maps shows 5 hours 37 minutes for 222 km (Kannur-Paliyekkara) as the shortest route. Is the Gmaps not considering the partially opened highways to calculate the route?
That works out to ~40 kmph, which means Google is indeed considering higher speeds through partially opened highways. Without that average would only be around 35 kmph.

To test, check out the distance and time from Kuttipuram Nila bridge to Paliyekkara. That is the point where your route diverges from NH 66, and that last 60-ish km would probably take 2 hours unless you are a bus.
binand is online now   (3) Thanks
Old 27th April 2025, 13:35   #68
Newbie
 
Join Date: Apr 2024
Location: Kozhikode
Posts: 8
Thanked: 3 Times
Re: NH 66 in Kerala | Status and Updates on 6-Lane Conversion

Yesterday, I drove from Calicut to Aluva. The biggest problem I found right from Malaparamba junction is that there is poor signage. Many places the road is open you go for 1 or 2 kms and then it's blocked. Google maps has totally wrong info for these places.

Some places there is indication for deviation and when you take the deviation it's fully blocked.

From Calicut to Ponnani there are many segments that are completed but from Ponani to North Paravur/Aluva it's barely complete.

Another big problem that we have in NH 66 is that the divider between to and from roads is extremely narrow as land acquisition was a hassle. Because of this NHAI is having difficulty in placing signage boards.There is also high chance of accidents affecting the opposite lane.
linea15 is offline  
Old 27th April 2025, 14:19   #69
Senior - BHPian
 
sarathlal's Avatar
 
Join Date: Apr 2012
Location: Trivandrum
Posts: 1,849
Thanked: 6,310 Times
Re: NH 66 in Kerala | Status and Updates on 6-Lane Conversion

Quote:
Originally Posted by Livnletcarsliv View Post
Is the Gmaps not considering the partially opened highways to calculate the route?
Quote:
Originally Posted by binand View Post
That works out to ~40 kmph, which means Google is indeed considering higher speeds through partially opened highways. Without that average would only be around 35 kmph.
With so many updates happening on frequent basis, Google maps is definitely off at multiple places. Sometimes the deviation it asks to take is not necessary.

To give a rough estimate, these are the averages to expect in current condition of the NH66 (Day time travelling):
Thrissur - Kozhikode: 55 kmph
Kozhikode - Kannur: 40 kmph
Kannur onwards: 45 kmph
sarathlal is offline   (2) Thanks
Old 27th April 2025, 14:37   #70
Senior - BHPian
 
Join Date: Dec 2008
Location: Bangalore
Posts: 3,833
Thanked: 6,127 Times
Re: NH 66 in Kerala | Status and Updates on 6-Lane Conversion

Quote:
Originally Posted by sarathlal View Post
Thrissur - Kozhikode: 55 kmph
You mean... you are able to do Thrissur-Kozhikode in 2 hours?? Despite it being only about half the distance on NH 66?
binand is online now  
Old 27th April 2025, 15:12   #71
Senior - BHPian
 
sarathlal's Avatar
 
Join Date: Apr 2012
Location: Trivandrum
Posts: 1,849
Thanked: 6,310 Times
Re: NH 66 in Kerala | Status and Updates on 6-Lane Conversion

Quote:
Originally Posted by binand View Post
You mean... you are able to do Thrissur-Kozhikode in 2 hours?? Despite it being only about half the distance on NH 66?
It's just a rough approximate.
Took around 2 hrs and 10 - 15 mins for the ~ 125 kms in this stretch.

Sorry, I did not understand the second part of the question ('only about half the distance on NH 66')
sarathlal is offline  
Old 27th April 2025, 15:34   #72
Senior - BHPian
 
Join Date: Dec 2008
Location: Bangalore
Posts: 3,833
Thanked: 6,127 Times
Re: NH 66 in Kerala | Status and Updates on 6-Lane Conversion

Quote:
Originally Posted by sarathlal View Post
Took around 2 hrs and 10 - 15 mins for the ~ 125 kms in this stretch.
That's quite good and I'm pleasantly surprised.

Quote:
Originally Posted by sarathlal View Post
Sorry, I did not understand the second part of the question ('only about half the distance on NH 66')
Thrissur-Calicut, the section Thrissur-Kuttipuram is a Kerala state highway and Kuttipuram-Ramanattukara is part of NH 66. The split is approx. 50:50.
binand is online now   (3) Thanks
Old 27th April 2025, 15:57   #73
M35
BHPian
 
M35's Avatar
 
Join Date: Dec 2012
Location: COK-PKD-SZX
Posts: 928
Thanked: 2,881 Times
Re: NH 66 in Kerala | Status and Updates on 6-Lane Conversion

I am planning a trip to Kollur Mookambika from Kongad, Palakkad. The last time I took this route was about 10 years ago.

What percentage of the newly constructed 4/6-lane road from Ramanattukara to Mangalore and then up to Udupi/Mookambika is complete? Also, how long will it take to reach there? I am planning to drive in June.
M35 is offline  
Old 27th April 2025, 18:07   #74
Senior - BHPian
 
sarathlal's Avatar
 
Join Date: Apr 2012
Location: Trivandrum
Posts: 1,849
Thanked: 6,310 Times
Re: NH 66 in Kerala | Status and Updates on 6-Lane Conversion

Quote:
Originally Posted by binand View Post
Thrissur-Calicut, the section Thrissur-Kuttipuram is a Kerala state highway and Kuttipuram-Ramanattukara is part of NH 66. The split is approx. 50:50.
Thanks for the details, and yeah I remember lots of deviations and changes of tracks. Maybe my start time of 6 am helped.

Quote:
Originally Posted by M35 View Post
Also, how long will it take to reach there? I am planning to drive in June.
A lot is going to change by June, so need to recheck around that time. For now, this distance is going to take roughly 9+ hours.
sarathlal is offline   (2) Thanks
Old 28th April 2025, 15:44   #75
BHPian
 
Join Date: Feb 2023
Location: Coimbatore
Posts: 80
Thanked: 209 Times
Re: NH 66 in Kerala | Status and Updates on 6-Lane Conversion

Glad I booked pondy for this year’s holidays. Will have to wait another year for Kerala to be ready for highway travel.
BlueGod is offline  
Reply

Most Viewed


Copyright ©2000 - 2025, Team-BHP.com
Proudly powered by E2E Networks