Originally Posted by wildon
(Post 1568828)
^^^ I have not yet succeeded to uncover that. |
Originally Posted by i10
(Post 1571628)
Wildon, a Hyundai VIN. Can you please help with this? MALBB51BR9M106806 |
Originally Posted by samsan02
(Post 1571748)
Hi Wildon, Can you please decode these two for me. I booked a Blue Punto 1.4 E+, no sign of getting one yet. So got these two vins from dealer, just incase I want to choose one. MCA118A5C07006625JPZ (black) MCA118A5C07005961JPZ(minimal grey) Thanks |
Originally Posted by wildon
(Post 1569119)
^^^Well I have not tried any Maruti/Suzuki but will have a go if VIN is provided |
Originally Posted by Gansan
(Post 1572142)
Here is my no. MA3EYD81S01381489 |
Originally Posted by Gansan
(Post 1572142)
Here is my no. MA3EYD81S01381489 |
Originally Posted by wildon
(Post 1572267)
Just check underneath the bonnet there will be a two digit number like F9 or something. Please confirm. |
Originally Posted by wildon
(Post 1574758)
^^^ The Production Month of this Vehicle is April 2009. MA3= Maruti Suzuki India EYD81S = Engine/Varient used for Alto cars. 01381489 = Serial Number D= April 9= Year 2009 Let see if i can cough up more details from the VIN if i get the right tools. |
Originally Posted by samsan02
(Post 1571748)
MCA118A5C07006625JPZ (black) MCA118A5C07005961JPZ(minimal grey) |
Originally Posted by wildon
(Post 1572061)
MCA= FIAT INDIA The Vin provided is wrong. Please check again, it should be either 1185AC (1.4 16V E3 95CV/70KW EMOTION PACK) or 118A55 (1.3 16V E3 75CV/55KW EMOTION PACK) 07006625/07005961 = Chasis Number JPZ= Its a September 2009 Make Vehicle. Update: I just read your post in "I Booked my Car" thread and you booked a Petrol one so the VIN should be like this MCA1185AC07006625JPZ (black) MCA1185AC07005961JPZ(minimal grey) |
Originally Posted by wildon
(Post 1564266)
The dealer is right ^^^Ford VIN number for the year 2009, The 11th digit represent YEAR , if its 9 then year is 2009 The 12th digit represent MONTH, if its C the month is September, if its K then its October This is applicable for the year 2009 only November = D December = E I hope this clear up your doubt. |
All times are GMT +5.5. The time now is 18:41. |