Absolutely, the blockade is at Aut so the alternative route which anupmathur suggests may not help. Blockade was temporary on the right bank (i.e. NH21), and road is clear now. Apparently, the day before when NH21 was blocked, traffic was diverted onto Shoja - is there a left bank road to get back to NH21 beyond Aut, between Aut & Kulu or Mandi & Aut?

Mandi is not blocked.
hvkumar is offline  
Old 8th July 2010, 21:10   #167
Senior - BHPian
 
Join Date: Sep 2007
Location: New Delhi
Posts: 3,095
Thanked: 307 Times

Quote:
Originally Posted by hvkumar View Post
Absolutely, the blockade is at Aut so the alternative route which anupmathur suggests may not help. Blockade was temporary on the right bank (i.e. NH21), and road is clear now. Apparently, the day before when NH21 was blocked, traffic was diverted onto Shoja - is there a left bank road to get back to NH21 beyond Aut, between Aut & Kulu or Mandi & Aut?
...
The question of left bank & right bank only comes at Bhuntar.
The road is not blocked at Aut; it is blocked at Katrain/Raison, beyond Kullu, half way point to Manali.
The route I suggested will work only if the left bank (Naggar side) route is clear, which it was till yesterday.
The left bank usually does not get disrupted as it is at a much higher level than the Beas river almost throughout.

HVK, is this OK or are there further updates?
anupmathur is offline  
Old 8th July 2010, 22:05   #168
Senior - BHPian
 
hvkumar's Avatar
 
Join Date: Nov 2006
Location: Mumbai
Posts: 7,369
Thanked: 3,454 Times

I agree, anupmathur, BoBolero told me that he had been diverted around Aut onto the Shoja side, but was bemused since AFAIK there is no road on the left bank before Bhuntar.
Day before, road was blocked at Aut also.
The road continuing from the Kulu bypass on the left bank is definitely higher and a good insurance against NH21 getting submerged at Raison/Katrain. It is also much more broader and straighter.

Rains have stopped in Manali region today after incessant rains for 2-3 days.
hvkumar is offline  
Old 9th July 2010, 12:20   #169
BHPian
 
yogi1771's Avatar
 
Join Date: Feb 2006
Location: mumbai
Posts: 697
Thanked: 15 Times

Any idea of the stretch from Yellapura to Udupi (NH 17).
yogi1771 is offline  
Old 9th July 2010, 13:13   #170
Senior - BHPian
 
Join Date: Sep 2007
Location: New Delhi
Posts: 3,095
Thanked: 307 Times

Quote:
Originally Posted by hvkumar View Post
I agree, anupmathur, BoBolero told me that he had been diverted around Aut onto the Shoja side, but was bemused since AFAIK there is no road on the left bank before Bhuntar.
....
There is an old road from Banjar to Sainj to Dhara to Bajaura. Used to be much used before the hydro projects changed the entire topography!
anupmathur is offline  
Old 9th July 2010, 13:46   #171
BHPian
 
Ushuaia's Avatar
 
Join Date: Oct 2009
Location: Gurgaon
Posts: 162
Thanked: 23 Times

Disruption on Highway in areas bordering Haryana and Punjab

Chandigarh-Ambala-Delhi highway closed to traffic

Incessant rain since Sunday forced the closure of the busy Chandigarh-Ambala-Delhi National Highway after a breach in the bundh on the seasonal Tangri rivulet at Jodhpur village near Handesra and overflowing of a seasonal rivulet flooded the major stretch near Jharmari barrier on Punjab-Haryana border in Lalru.

A 50 ft wide breach in the bundh made way for the gushing waters to flow in the open. Several villages in the area and the highway stretch was submerged under 3-4 feet water, trapping several vehicles passing through, which led to a major traffic jam, around 10 am.

The highway was immediately closed and vehicular traffic from Chandigarh towards Ambala and Delhi was diverted from Zirakpur towards Banur-Rajpura while that heading from the opposite direction was diverted from Ambala towards Rajpura.

Confirming the development, Mohali Deputy Commissioner Prabhjot Singh Mand told Newsline that they have tied up with his Ambala counterpart to avoid plying of vehicles on the highway till the water recedes. Till the filing of this report late in the evening, the highway was submerged and remained closed for vehicular traffic.
Ushuaia is offline  
Old 9th July 2010, 18:37   #172
Senior - BHPian
 
hvkumar's Avatar
 
Join Date: Nov 2006
Location: Mumbai
Posts: 7,369
Thanked: 3,454 Times

Quote:
Originally Posted by anupmathur View Post
There is an old road from Banjar to Sainj to Dhara to Bajaura. Used to be much used before the hydro projects changed the entire topography!
Aha, thanks anupmathur, that is the road our friend BolBolero was diverted into. I located the road on google maps:
Aut, Himachal Pradesh, India to Bhunter, Himachal Pradesh, India - Google Maps
hvkumar is offline  
Old 9th July 2010, 18:39   #173
Senior - BHPian
 
hvkumar's Avatar
 
Join Date: Nov 2006
Location: Mumbai
Posts: 7,369
Thanked: 3,454 Times

Rains have stopped at last in Kulu Valley and Lahaul Valley, weather is bright and sunny in Manali, conditions limping back to normalcy.
hvkumar is offline  
Old 10th July 2010, 22:17   #174
Senior - BHPian
 
hvkumar's Avatar
 
Join Date: Nov 2006
Location: Mumbai
Posts: 7,369
Thanked: 3,454 Times

Traffic on Rohtang Pass is dislocated for the fourth day thanks to heavy landslides close to the Pass. The road opens and closes intermittently as road is cleared by BRO, but there is a huge waiting list of vehicles on both sides (Manali & Keylong) waiting to be cleared.
hvkumar is offline  
Old 10th July 2010, 22:18   #175
Senior - BHPian
 
hvkumar's Avatar
 
Join Date: Nov 2006
Location: Mumbai
Posts: 7,369
Thanked: 3,454 Times

Chandigarh bypass road from Ambala side (NH1) to Kharar (NH21) via Banur appears to be damaged and light vehicles are being diverted through some village roads.
hvkumar is offline  
Old 14th July 2010, 13:23   #176
Senior - BHPian
 
hvkumar's Avatar
 
Join Date: Nov 2006
Location: Mumbai
Posts: 7,369
Thanked: 3,454 Times
Bangalore-Calicut Road

http://www.team-bhp.com/forum/1981358-post1378.html

Reported by sv1976 in the above thread:

Muthanga-Sulthan Bathery has some new potholes but not that bad. Effect of rains is clearly visible in Wayanad ghats and hairpins with some of them really tough to handle.
hvkumar is offline  
Old 14th July 2010, 13:23   #177
Senior - BHPian
 
hvkumar's Avatar
 
Join Date: Nov 2006
Location: Mumbai
Posts: 7,369
Thanked: 3,454 Times

Quote:
Originally Posted by hvkumar View Post
Chandigarh bypass road from Ambala side (NH1) to Kharar (NH21) via Banur appears to be damaged and light vehicles are being diverted through some village roads.
Road is now reopened.
hvkumar is offline  
Old 15th July 2010, 08:51   #178
Team-BHP Support
 
moralfibre's Avatar
 
Join Date: Dec 2004
Location: MH-12
Posts: 8,451
Thanked: 13,973 Times

Not due to monsoon but still worth a post in this thread - Manali - Leh Highway blocked.

Any team-bhpians stuck?
moralfibre is offline  
Old 15th July 2010, 09:32   #179
Senior - BHPian
 
hvkumar's Avatar
 
Join Date: Nov 2006
Location: Mumbai
Posts: 7,369
Thanked: 3,454 Times

Quote:
Originally Posted by moralfibre View Post
Not due to monsoon but still worth a post in this thread - Manali - Leh Highway blocked.

Any team-bhpians stuck?
Lots of our friends have had trouble with the Rohtang Pass closure. BolBolero waited out 3 days for Rhtang to reopen, finally gave up, changed his plans and went off to Spiti Valley via Rampur.
hvkumar is offline  
Old 15th July 2010, 09:35   #180
Senior - BHPian
 
hvkumar's Avatar
 
Join Date: Nov 2006
Location: Mumbai
Posts: 7,369
Thanked: 3,454 Times

Quote:
Originally Posted by yogi1771 View Post
Any idea of the stretch from Yellapura to Udupi (NH 17).
No one seems to have replied!
My last update is that NH63 is excellent, and NH17 remains the same condition as before.