Re: Mumbai Traffic

Quote:
Originally Posted by Desmosedici View Post
Please read today's Times of India page 5 on Aarey Road reconstruction. Seems like another crooked scheme to make a fast buck.
Hello,

Here are the details of the Aarey Road Reconstruction:

- Aarey road to be upgraded at a cost of Rs. 135 crores using BOT (Built Operate Tranafer) model
- Road Contractor will recover the cost within 16 year, 3 months & 20 days (how can they calculate so precisely?)
- The work will be complete within 18 months
- Tow lanes will be concretized & asphalt will be laid on third lane.
- The amount of Toll for different types of vehicles is not yet decided.
- PWD has finally accepted that the road is not motorable in this current state.

Full article here: http://timesofindia.indiatimes.com/c...w/19314239.cms

The most important point, it is not clear whether the road will be closed during these 18 months? The currently the road is just a two laned road & I feel they will have to completely stop vehicular movements during reconstruction.

Thanks,
Jignesh is offline  
Old 1st April 2013, 11:22   #377
Senior - BHPian
 
Desmosedici's Avatar
 
Join Date: Nov 2009
Location: White Village
Posts: 1,484
Thanked: 586 Times

Do you think they will stop vehicular movement. No ways. It gets in so much moolah that they won't do anything like that. I just hope they lay fresh tar and make the road motorable. I then won't mind paying the toll.

But if they start some new gimmick and increase the toll then Jvlr it would be for me.
Desmosedici is offline  
Old 1st April 2013, 11:24   #378
BHPian
 
sa_kiran's Avatar
 
Join Date: Jun 2011
Location: Thane
Posts: 515
Thanked: 169 Times
Re: Mumbai Traffic

Quote:
Originally Posted by ghodlur View Post
BTW guys anyone noticed that the Ramakrishna hotel (the same one which blocked the traffic opp IIT main gate) on the JVLR has been officially pulled down. This makes way for the service road to be made so that the buses dont spill on the main JVLR. Now the only obstruction is the Hanuman temple, hope the authorities do away with it too minus any commotion/riots.
Frankly, it makes little difference. The traffic build up is much more before this place, starting from the right turn on EEH. For the last one month or so, I've been driving in 1st (or sometime 2nd) gear from EEH till Saffron Spice. So, the bottleneck is not really this hotel. The authorities should engage REAL EXPERTS to find out the problem and suggest solution.

The traffic was particularly bad today. My drive from home to office, which takes about 35-40 minutes too 1 hour 5 minutes today. There were traffic buildups all along. Buses and cars stopping at the start of flyovers to drop/pickup passengers should be mercilessly penalized. They hold up traffic. Also, noticed too many trucks on streets, a lot of them stopped by police after the right turn into JVLR.
sa_kiran is offline  
Old 1st April 2013, 11:36   #379
Senior - BHPian
 
ghodlur's Avatar
 
Join Date: Sep 2009
Location: Thane
Posts: 6,011
Thanked: 4,203 Times
Re: Mumbai Traffic

Quote:
Originally Posted by sa_kiran View Post
So, the bottleneck is not really this hotel. The authorities should engage REAL EXPERTS to find out the problem and suggest solution.
The hotel was a fly in the ointment when the service road was being constructed. Till now the buses and private vehicles used to turn into the main JVLR forcing the traffic build up at the IIT market gate signal and subsequently after that too.

With the hotel gone atleast the service road will be completed and the spillage of vehicles on JVLR would be lesser. Agree that the authorities should rethink on the traffic congestion but then thats BMC. You dont expect some technological marvels to reduce the traffic from BMC.
ghodlur is offline  
Old 2nd April 2013, 11:29   #380
BHPian
 
sa_kiran's Avatar
 
Join Date: Jun 2011
Location: Thane
Posts: 515
Thanked: 169 Times
Re: Mumbai Traffic

I had been to Vikhroli yesterday and noticed LBS Marg dug up for replacing water pipeline. About half a km is dug up starting from a little before station road and will go all way up to Gandhi Nagar. We are now in April and digging has just started, expect the work to go on for at least 6 months. Get ready for Nightmare on LBS Street, particularly during Monsoon!
sa_kiran is offline  
Old 3rd April 2013, 14:49   #381
BHPian
 
Dieseltuned's Avatar
 
Join Date: Sep 2012
Location: Bombay
Posts: 714
Thanked: 1,162 Times
Re: Mumbai Traffic

The authorities have started relaying the WEH near Malad pathanwadi flyover and Kandivali Saidham (thakur complex). But as usual the quailty of recarpetting is hoorendous to say the least.
Dieseltuned is offline  
Old 3rd April 2013, 16:44   #382
BHPian
 
Join Date: May 2006
Location: Mumbai
Posts: 152
Thanked: 48 Times
Re: Mumbai Traffic

Quote:
Originally Posted by Dieseltuned View Post
The authorities have started relaying the WEH near Malad pathanwadi flyover and Kandivali Saidham (thakur complex). But as usual the quailty of recarpetting is hoorendous to say the least.
Good thing is that they are removing those stupid paver blocks. But as you said quaility of recarpetting is poor and I think couple of showers in the month of June would be enough to wash that out.
abhijitvp is offline  
Old 3rd April 2013, 18:29   #383
Senior - BHPian
 
Jignesh's Avatar
 
Join Date: Dec 2011
Location: Near Frankfurt
Posts: 1,609
Thanked: 965 Times
Re: Mumbai Traffic

Quote:
Originally Posted by Dieseltuned View Post
But as usual the quailty of recarpetting is hoorendous to say the least.
Quote:
Originally Posted by abhijitvp View Post
But as you said quaility of recarpetting is poor and I think couple of showers in the month of June would be enough to wash that out.
Hello Dieseltuned & Abhijitvp,

I believe you have passed through Aarey Flyover after upper layer relaying & the work is very well done. The road surface on Aarey Fly-Over is really very smooth.

I believe the work is still going on WEH between Malad & Kandivali & this time around the authorities seem to be doing a good job. Just wait for few days & you will see a good road on this stretch.

But, I cannot comment on state of these roads after monsoon sets in. Because based on past experience, pot holes will definitely emerge. Afterall unless pot holes do not emerge after regular intervals (read - every year), how will multi-million road repair contracts will be approved every year.

Hello All,

Authorities have now stopped using Paver Blocks on road repair / new roads. These blocks will now will only be used on footpaths.
It seems strange to know that once upon a time first choice for corporators for quick repair of roads were Paver Blocks which are out of demand now. Just for sake of information these Blocks are very costly (as compared to Tar & Concrete Roads) & original plan was to used them only on side roads (between Contrete road & footpath) & on footpaths. But over the time, authorities started to use these blocks on entire roads & junctions.

Thanks,
Jignesh is offline  
Old 3rd April 2013, 18:53   #384
BHPian
 
Dieseltuned's Avatar
 
Join Date: Sep 2012
Location: Bombay
Posts: 714
Thanked: 1,162 Times
Re: Mumbai Traffic

Hello Jignesh,

The aarey flyover on WEH was redone recently and there are loads of things that our authorities need to learn.
some pointers :

1. They have painted the white marker lines only on the sides of the road.
2. no lane markings on the new surface

Regards
Dieseltuned
Dieseltuned is offline  
Old 5th April 2013, 13:20   #385
Senior - BHPian
 
ghodlur's Avatar
 
Join Date: Sep 2009
Location: Thane
Posts: 6,011
Thanked: 4,203 Times
951 fleet cabs to be added on Mumbai roads

Tabcabs is expanding by adding 951 cabs in its fleet which makes it largest fleet cab service provider surpassing Meru. Tabcabs will now officially have 2800 cabs plying on the Mumbai roads. Add other fleet cab numbers and the total serviced cabs on Mumbai road reach 6000.
Fleet Comparison
* Meru Cabs: 2,050
* TabCab: 1,849 (will grow to 2,800)
* Easy Cabs: 800
* Mega Cabs: 250
* Others (Viira, Priyadarshini): 100 (approx)

http://timesofindia.indiatimes.com/c...w/19391472.cms

Mods: could not find any thread related to Tab cabs, hence posting here. If thread exists request to move accordingly.

Last edited by ghodlur : 5th April 2013 at 13:27. Reason: Attached the new link
ghodlur is offline  
Old 5th April 2013, 15:48   #386
BHPian
 
Dieseltuned's Avatar
 
Join Date: Sep 2012
Location: Bombay
Posts: 714
Thanked: 1,162 Times
Re: Mumbai Traffic

In my personal opinion and driving experience, The TAB cab has the worst drivers I have come across out of all these fleet cabs. Some things these TAB guys always do are:

1. Excessive persistent honking
2. lane cutting without any signs
3. tailgatting (specially with smaller cars like Wagy,Alto, Eon) etc.

Just from my personal experience on the WEH
Dieseltuned is offline  
Old 9th April 2013, 13:40   #387
Senior - BHPian
 
ghodlur's Avatar
 
Join Date: Sep 2009
Location: Thane
Posts: 6,011
Thanked: 4,203 Times
Re: Mumbai Traffic

BHPians, Pls take a note of the changes to the traffic issued by the Mumbai traffic police owing to the IPL matches being held in Mumbai. If anyone happening to visit the place mentioned, take extra precaution.

Quote:
No.89/DCP/TEMP/T/2013
The event of IPL-2013 20-Twenty Cricket matches are being played at Wankede Stadium Churchgate Mumbai on 9th, 13th, 27th, , 29th April 2013 and 5th, 7th, 13th , 15th May 2013.
Following changes have been made in the routine traffic pattern.

(A) ‘D’ Road shall be one way for vehicle traffic from its junction with N.S. Road (Marine Drive) to its junction of “E” & “C” Road on 13th April 2013 & 5th May 2013 from 13.00 Hrs.to 21.00 Hrs. and on 09th, 27th, 29th April, 2013 & 07th, 13th, 15th May 2013 from 17.00 Hrs to 24.00 Hrs.
(B) ‘C’ Road shall be One Way for vehicular traffic from its junction of “E” Road to its junction of N.S. Road (Marine Drive) on 13th April 2013 & 5th May 2013 from 13.00 Hrs.to 21.00 Hrs. and on 09th, 27th, 29th April, 2013 & 07th, 13th, 15th May 2013 from 17.00 Hrs to 24.00 Hrs.
(C) “E” Road shall be One Way for all types of vehicles from its junction of ‘D’ Road to its junction of ‘C’ Road on 13th April 2013 & 5th May 2013 from 13.00 Hrs.to 21.00 Hrs. and on 09th, 27th, 29th April, 2013 & 07th, 13th, 15th May 2013 from 17.00 Hrs to 24.00 Hrs.


Parking of all types of vehicles shall be prohibited on 13th April 2013 & 5th May 2013 from 13.00 Hrs.to 21.00 Hrs. and on 09th, 27th, 29th April, 2013 & 07th, 13th, 15th May 2013 from 17.00 Hrs to 24.00 Hrs.
  1. “D” Road “C” Road from the junction of N.S.Road to the junction of “E” Road.
  2. “E” Road from the junction of “D” Road upto “C” road.
  3. “F” Road from the junction of N.S.Road to the junction of “E” Cross road.
  4. “E” Cross road from the junction of “F” Road to the junction of “G” Road.
  5. N.S.Road South bound from Princess Street Bridge to Air India Junction.
  6. M.K.Road both the bounds from Churchgate Junction to Anandilal Poddar Marg. Junction.

ghodlur is offline   (1) Thanks
Old 10th April 2013, 09:27   #388
Senior - BHPian
 
ghodlur's Avatar
 
Join Date: Sep 2009
Location: Thane
Posts: 6,011
Thanked: 4,203 Times
Re: Mumbai Traffic

Heavy traffic jam today morning on the Ghodbunder Road near Kapurbawdi due to the drilling setup for the flyover pillar. Saw a Dzire's front bumper smashed by a private bus in an attempt to wriggle out of the jam. This further worsened the traffic.

Wrote a mail to Traffic commissioner Mumbai regarding the multiple lane formation at the signal turning to Powai on Eastern express highway and got a prompt reply/error
"The following recipient(s) could not be reached:

transportcommissioner@trafficpolicemumbai.org
Error Type: SMTP
Error Description: Inbox is full
Additional information: The recipients inbox is full."

Who says the Traffic commissioner regulalry monitors the commuters mails.
ghodlur is offline   (2) Thanks
Old 10th April 2013, 10:01   #389
BHPian
 
engrohit's Avatar
 
Join Date: Oct 2012
Location: Thane
Posts: 153
Thanked: 91 Times
Re: Mumbai Traffic

Quote:
Originally Posted by ghodlur View Post
Heavy traffic jam today morning on the Ghodbunder Road near Kapurbawdi due to the drilling setup for the flyover pillar. Saw a Dzire's front bumper smashed by a private bus in an attempt to wriggle out of the jam. This further worsened the traffic.


Who says the Traffic commissioner regulalry monitors the commuters mails.
Agree mate! Exiting Thane has become a pain now.
First it is the Kapurbawdi junction (We avoid that by taking Kolshet road> Big Bazar route),
then it is kopri bridge beginning from teen haat naka flyover onward (Today it was horrible), then the bottleneck before toll plaza.
You do all this and straighten your back a bit and the right turning traffic at Kanjur marg awaits you.

I sometimes wonder, is it only the sheer no. of increased cars on the road or something else? For eg: Nothing has changed at the right turn at kanjur marg in terms of infrastructure, but the traffic snarls keep getting longer with the day.
engrohit is offline  
Old 11th April 2013, 16:16   #390
Newbie
 
Join Date: Feb 2010
Location: Mumbai
Posts: 19
Thanked: 53 Times
Re: Mumbai Traffic

Just want to give a heads-up to anyone who uses the Vashi bridge for daily commutes or weekend trips outside Mumbai. It is being closed fully on the side towards Vashi, and partially towards Mumbai. This will happen till the middle of next week. Traffic towards Vashi will be directed on the old bridge which frankly cannot cope up with the volume. Take a detour via Airoli instead. More details here - http://timesofindia.indiatimes.com/c...w/19485738.cms